Behind the Scenes of Stabilizing the Asphalt Base at Glen Hills Middle School - CASE STUDY

Posted by J. Mrugacz on Oct 9, 2012

The Base/Subgrade Stabilization Project

The project starts at 8:00 a.m. on the dot at Glen Hills Middle School. The semi truck carrying the load of cement powder rolls in. About half an hour later, the cement powder starts getting laid over the parking lot that has had the asphalt parking lot that was here pulverized. At this point, all that’s left is the pulverized asphalt and gravel bed mixture.  Now, every square foot gets an application of cement powder at a depth of around 1.5-2” depending on site conditions the day of work.

At 8:55 a.m., the pulverizer starts following behind the cement powder truck.  The pulverizer goes 14” into the existing base material, mixing the powder with the existing base material. Once the two are mixed together, the concrete powder starts reacting, hardening the stabilized base components. It is also at this time that the newly mixed stabilized base is tested for the right moisture. To check for this, a ball of the stabilized base is made and it should fall apart after being bounced in a hand.

What to Look for in a Residential Asphalt Paving Contractor

Posted by J. Mrugacz on Jun 15, 2012

Your parking lot or driveway is in disrepair with pot holes everywhere but you have no idea who to turn to for your asphalt maintenance. You know you need to get it fixed but where to even start looking?

Wolf Paving Hits a Home Run at 5 Diamonds – CASE STUDY

Posted by J. Mrugacz on Jun 1, 2012

As baseball season takes full swing this summer, many baseball parks have been getting the diamonds and fields ready. This also means preparing the parking lots for increased traffic volume with families coming and going to baseball games.